The
building was originally intended to be a two story building using light
wieght swage floor beams with t&g board deck.
As
the building evolved the clienst realised that they did not have enough
room to meet their production requierments. The site was tight and the
only option was to build up.
We
established a new floor layout and an architect was appointed to make
an amended planning application.
|
 |
 |
|
665 North Circular
Road, London NW2
Isometric strucad
drawing showing the structural steel work and scantling layout.
The calculations
were prepared by our own retained consulting engineers Messrs Steel
Frame Designs Ltd., Hereford.
|
|
|
|